09-20-2016, 11:45 AM
(09-20-2016, 11:20 AM)GtwoK Wrote: Northfield is set to open September 30! INCLUDING Kumpf AND the highway ramps! This is so exciting, the ramps closed the same time King did at the grade separation, this must make it the longest closure that's reopening that we've had so far, no? Highly anticipated, I'm sure. They also are 2 months ahead of schedule there, which is great.
I've been waiting with bated breath for this opening, and the subsequent complaints about what they've done with the highway interchange. :-)