09-23-2016, 01:34 PM
The phase II condo building is also now topped off at 6 stories, windows being installed on the lower floors. The internal roads should be completed before winter with curb repairs, re-paving, street lighting, sidewalks etc... This should really finish things off for the town homes (Now all built)

