I think its just "beyond 2020" right now.
It sounds like by the end of next year they'll have done some of the work around 85 (the Victoria street bridge, some of the Wellington exit) and a bunch of prep like building demolition. But that sounds like it. And there's still a lot of work to do after that. My wild ass guess is like 2022.
Edit: Just noticed that it looks like the Victoria street bridge isn't going to be replaced until 2018. So... even 2022 is probably optimistic. Although I assume once they actually start building the bulk of the road it will actually go quite quickly.
It sounds like by the end of next year they'll have done some of the work around 85 (the Victoria street bridge, some of the Wellington exit) and a bunch of prep like building demolition. But that sounds like it. And there's still a lot of work to do after that. My wild ass guess is like 2022.
Edit: Just noticed that it looks like the Victoria street bridge isn't going to be replaced until 2018. So... even 2022 is probably optimistic. Although I assume once they actually start building the bulk of the road it will actually go quite quickly.