10-01-2016, 09:18 AM
It is interesting that a railing was needed along the sidewalk along the west side of King at Union in front of the Sunlife gates; I guess it was too high and steep with the revised grade. I think snow clearing along various stretches of the route is going to be interesting to say the least. May Clearpath can invent some snowplow bots to get in to theses narrow and odd spaces.
This is not a new sign, but an older one that did not get removed in front of the Allen Square building. There used to be a delivery/loading bay along King and now the sign implies that you can unload for 30min while parked on the tracks:
This is not a new sign, but an older one that did not get removed in front of the Allen Square building. There used to be a delivery/loading bay along King and now the sign implies that you can unload for 30min while parked on the tracks:
Everyone move to the back of the bus and we all get home faster.