11-01-2016, 01:17 AM
(10-31-2016, 11:20 PM)DHLawrence Wrote: I thought the preferred routing had been chosen. They have all the track diagrams on the region website.
Stage 1 routing has been decided and is set.
Stage 2 is still under consideration. Some new information about the feasibility of the rail crossing on Eagle street came to light which necessitated the Region re-examine the routing for Stage 2. The Region was to present their preferred option for Stage 2 ION this fall, however the consultations have been pushed into the winter.