11-30-2016, 10:31 AM
(11-29-2016, 07:30 PM)MVO95 Wrote: What else is remaining?
Debris removal, street sweeping, a few small sections of paving, sidewalks to pour (and set; the west side was being poured this morning), signal activation (although maybe lime downtown Kitchener they'll use stop signs for the forseeable future), signage installation, line painting, construction fence/barrier removal, ...to name a few.
I've always been impressed at how these road openings seem to come together at the last minute; I am sure this one will be no different and will only and to my astonishment that so much can get done in such a short time.
Everyone move to the back of the bus and we all get home faster.