12-10-2016, 11:42 PM
Yeah, I'm very curious how this will all work operationally, and if Transport Canada will ease any of their rules here at all (ie, bells only during arm motion, etc.).
I imagine since this is a major critical intersection it could be a synch point where they try to get both trains going through at the same time to minimize the disruption.
I imagine since this is a major critical intersection it could be a synch point where they try to get both trains going through at the same time to minimize the disruption.