So much going on this morning!
Maybe I'm wrong, but I was pretty sure those aren't the same LED sign boards in the GRT stops. The bulbs of the LED's looked much larger to me (lower resolution/one line of text only). But, I was driving by, so could only get a glance. I've never seen the GRT ones up close.
- Contact wire is now strung from Erb/Caroline all the way to GRH on the Southbound tracks!
- Crew at Seagram, wiring the control box for the anchor wall electronics
- Crews at GRH working on the station
- HUGE crew and concrete pour going on under the Grade Sep
- People still parked on the tracks at Tannery
- ~20 guys working on the Cameron Heights crossover
- Kitchener Glass installing the roof at Borden
Maybe I'm wrong, but I was pretty sure those aren't the same LED sign boards in the GRT stops. The bulbs of the LED's looked much larger to me (lower resolution/one line of text only). But, I was driving by, so could only get a glance. I've never seen the GRT ones up close.