01-23-2017, 12:18 PM
(01-20-2017, 12:56 PM)Markster Wrote:Quote: The options are roughly mapped, but not all of the details have been worked out.
• For Kitchener/North Cambridge, trains would travel Fairway Road to Maple Grove Road, Speedsville Road to Eagle Street, and connect to Hespeler Road at Pinebush Road.
• For South Cambridge, trains would travel from the Ainslie terminal up Beverley Street, or in the vicinity of Beverley and along Dundas to Hespeler Road; alternatively, they would go up Ainslie Street, to Water, through the Delta and on to Hespeler Road.
Whelp, they're seriously considering the Maple Grove/Speedsville industrial park route.
While I realize there is already a rail line running along part of that route, I really wished it went straight along Fairway and hit up the airport, and then down fountain. One can dream.
Oh well, maybe Phase 3 will have it run along the proposed Ottawa St extention and not only will I get the train to YKF, but I'd have a stop near my house!
Coke