05-21-2017, 04:46 AM
(05-20-2017, 02:51 PM)kps Wrote:(05-20-2017, 12:36 PM)dunkalunk Wrote: […] all of the work tht's currently being done as part of the EA is the same kind of work that will need to be done for AD2W, […]
As the folks on UT point out, no EA is required for improvements in an existing rail right of way, or for running up to 200 km/h — i.e. for AD2W between KW & Toronto at twice the current speed. This announcement is just kicking the can down the road past the election, again.
You can make improvements to an existing corridor without an EA, you can't bulldoze half of Kent St without an EA.