11-10-2017, 08:34 PM
2/2 - Friday, November 10, 2017
I see you, Metrolinx Pilot LRV!
The end of the high-speed test track. The track was powered up, but unfortunately, we didn't see any motion while we were there.
Always a beautiful and welcome sight: The third-generation ICTS prototype out on the primary LIM test loop at the front of the facility.
I see you, Metrolinx Pilot LRV!
The end of the high-speed test track. The track was powered up, but unfortunately, we didn't see any motion while we were there.
Always a beautiful and welcome sight: The third-generation ICTS prototype out on the primary LIM test loop at the front of the facility.