12-03-2017, 05:01 PM
(12-03-2017, 03:01 PM)Pheidippides Wrote: The work from the Ion tracks to Erb was actually removed from the Ion project; so both should have had the same set of plans (although now that I think about it I think the extension of the separated bike lanes to the Laurel Trail came after the work was removed).
I was at least hoping they would take the opportunity to fix the clutter on the sidewalk near the pizza place:
I am still wondering why sand was used to finish the work (out of time?, too cold?).
Oh, those boxes are even worse than I'd hoped before. Frankly, it's not acceptable on any sidewalk (and there are many where Grandlink has done this) but in uptown, it's especially egregious.