08-13-2018, 09:03 PM
(08-13-2018, 06:06 PM)Canard Wrote: The piers for the new Franklin St. Bridge over 401 are being exposed (formwork being removed). The North side is already fully exposed and they’re removing elements of the South.
I wonder when they're closing the exit from 401-E to Franklyn St. N? Signage says "To be closed" but no date given. Unsure why they even have to close it at all.
Not looking forward to the closure, as I have a client in that area that I need to attend regularly. Best option would be to go through the power centre, but still not as good at the 401.