09-04-2018, 10:19 PM
The Ottawa St widening from the highway to Lackner is still having some work done on the section closest to the highway.
The company that put down the grass, put down a strip of sod along for road and along the sidewalk, in between they used the spray grass solution. The resulting boulevard is almost 100% weeds. Earlier in the summer especially the section near old Chicopee Dr the sod was dead. So far this part of the project looks terrible.
The company that put down the grass, put down a strip of sod along for road and along the sidewalk, in between they used the spray grass solution. The resulting boulevard is almost 100% weeds. Earlier in the summer especially the section near old Chicopee Dr the sod was dead. So far this part of the project looks terrible.