11-10-2018, 09:28 PM
(11-10-2018, 08:19 PM)Pheidippides Wrote: Sure they had a construction schedule back then; it wasn't detailed to the point of specific hours of specific days, but they had a general timeline and phasing:
• "2014: begin construction of LRT Stage 1; and"
• "2017: complete construction and begin operation of LRT Stage 1."
And that does not say "early 2017". The word "early" only appears in connection with the LRT ridership forecast.