02-12-2019, 01:53 PM
(This post was last modified: 02-12-2019, 01:56 PM by trainspotter139.)
(02-12-2019, 01:40 PM)Spokes Wrote: Will that be the same once fully operational?
I would say yes. But also be mindful that the deadhead runs to Fairway and Conestoga for service start will count as sweep runs so the impact of sweep runs would be very minimal. They are designed, essentially, to check to any obstacles or damage to the infrastructure that may have occurred when the system was out of service. They wouldn't be required if there were Ice/Snow trains operating overnight as well.