the hole is now up to the road along Victoria at about one story below grade. they have gravel all the way along to ruffly the edge. the entrance to the parking seems to be from the driveway to the left side. since the site is on a hill the back of the property will look like 8 floors instead of the 7 from Victoria. I am thinking the back will just be columns on the parking floor than the wall starting further back. as it gets into the hill. (basically from the end you can look at all the cars).
if my source is correct Fred Kau Plumbing and Heating will be doing the plumbing ( they are the same people that did 100 Vic tower 1 and are currently doing Arrow lofts phase 2 and Williamsburg walk phase 2 along with a bunch of towers in Hamilton.
if my source is correct Fred Kau Plumbing and Heating will be doing the plumbing ( they are the same people that did 100 Vic tower 1 and are currently doing Arrow lofts phase 2 and Williamsburg walk phase 2 along with a bunch of towers in Hamilton.