Of course it would have made more sense/ probably would have been cheaper to do it in phase one. But it was all about cost savings to get the LRT built and a hydro tower/ line was an easy line item to save a couple million.
You can clearly see in the preliminary drawings for phase two that they will still be moving the hydro tower to a new subsurface station across fairway. Yes they shifted the alignment slightly but not enough for the leave the tower above ground at that location.