Bruce and Edna will be grade separated from the CN tracks, as will the ramps to Hwy 7. The Christie lot is going to become significantly smaller. A detailed map of the interchange is available on the first page of this thread.
I wonder if the new bridge structures will be constructed as a single span or not. With the changes to the Wellington/Victoria interchange planned, four carriageways seems unnecessary and the ROW would be significantly enlarged by eliminating the separation.
I wonder if the new bridge structures will be constructed as a single span or not. With the changes to the Wellington/Victoria interchange planned, four carriageways seems unnecessary and the ROW would be significantly enlarged by eliminating the separation.