12-12-2020, 02:17 PM
Did anybody notice that they’re planning to bury a bit more of the hydro line, through to the transformer station on the other side of Fairway Road?
Seems like they might have realized they needed to do that when they buried the other part for Phase 1. It’s not like the desire for Phase 2 was a big surprise.
Not to mention the final pair of OCS poles positioned exactly where the track extension needs to go.
On the plus side, it appears to be separated right of way with just a few level crossings all the way from Fairview to Hespeler Rd. so it shouldn’t be limited by roadway speed limits.