There were 5 pieces of culvert on site as of this morning at Laurel Creek. They seem to have the water breach under control and have started to pump out the excess again. The one dam has been emptied and moved from the lake side to the track side of the pedestrian bridge. As of 8 this morning, it was laying across a temporary roadway that has been created across the creek.
This will hopefully cause them to reconsider their rainwater mitigation techniques (i.e. get more pumps.)
There's a 4 day period where they plan on working round the clock (July 17-20). One would guess this is when they'll be laying the new tracks and reconfiguring the spur in the area or replacing the old bridge with the new culvert.
On Caroline, it looked as though they were removing the old septic and storm pipes on the west side of the road.
This will hopefully cause them to reconsider their rainwater mitigation techniques (i.e. get more pumps.)
There's a 4 day period where they plan on working round the clock (July 17-20). One would guess this is when they'll be laying the new tracks and reconfiguring the spur in the area or replacing the old bridge with the new culvert.
On Caroline, it looked as though they were removing the old septic and storm pipes on the west side of the road.