(07-06-2021, 02:51 PM)avernar Wrote:(07-05-2021, 12:07 PM)jamincan Wrote: Whereabouts is the work being done? There was an EA done a few years ago on widening 7/8 to 4-lanes through to Stratford. http://www.7and8corridorstudy.ca/maps.htmlThat's to far west. A timio wrote, between Trussler and Queen.
They were redoing the drainage in the median and did work on the culvert. But now those wooden poles were put in and they're just way to close to the median shoulders.
It looked like they were creating cross over lanes for westbound traffic, which I'd imagine will be swapped once they do what they need to do on the one half, then they'll repeat the other half.
The work never ceases. I can't remember the last time highway work wasn't being done in the region, be it the 401, highway 8, the expressway, etc. I can't only recall back to the mid 80's, that would have been the highway 8 bypass.