07-08-2021, 10:27 AM
(07-07-2021, 11:01 PM)jeffster Wrote: It looked like they were creating cross over lanes for westbound traffic, which I'd imagine will be swapped once they do what they need to do on the one half, then they'll repeat the other half.Yeah, I saw the crossover. The power poles follow the crossover to the other side. But this is the first time I've seen a need for those poles for this type, or any type, of highway work.
The work never ceases. I can't remember the last time highway work wasn't being done in the region, be it the 401, highway 8, the expressway, etc. I can't only recall back to the mid 80's, that would have been the highway 8 bypass.