You cannot cross the tracks on King near Victoria; GrandLinq has placed fences up with no pedestrian pass-through, and has disabled the railway crossings. A recent update indicated that CN required that construction start no sooner than 3 weeks after the fence went up to acclimatize people to the new restriction and try as best as possible to ensure that no one gets hit by a train there.
As for the Waterloo Park Culvert, it's 3 "tubes" wide, and each will have 10 box segments. Last weekend, 4 segments were placed (12 total), with 18 more remaining.
As for the Waterloo Park Culvert, it's 3 "tubes" wide, and each will have 10 box segments. Last weekend, 4 segments were placed (12 total), with 18 more remaining.