11-24-2021, 10:20 AM
All the parts for the tower crane have arrived on site over the last 2 days with the exception of the slewing unit so the tower crane should be going up soon. The shoring drill is also no longer on site.
|
Block 599 (599 Strasburg Rd) | 8 fl | Completed
|
|
« Next Oldest | Next Newest »
|