12-22-2021, 03:36 PM
I was riding around the LRT today and looking at my GPS to tell the speed again. The track design between Mill and Block Line is really terrible. I should time how long it takes to go through 15km/h section. Going north, heading into Mill, the train can't even quite reach 70km/h before it has to slow down again for the stop. Unfortunately, I think that the solution right there involves money and land expropriation (or road narrowing), not more realistic safety standards.
The other thing is that I was having a bad time with it being cold outside and my fingers therefore being cold and trying to operate the easyGO recharging machine.
The Traynor crossing seems fine, though it really was a production to get it done.
The other thing is that I was having a bad time with it being cold outside and my fingers therefore being cold and trying to operate the easyGO recharging machine.
The Traynor crossing seems fine, though it really was a production to get it done.