Posts: 8,014
Threads: 39
Joined: Jun 2016
Reputation:
215
@clasher I believe this was already added to region bylaws that blocking the LRT will be a fineable offence under the bylaw.
@jCnb You're right the curb is permanent, and will have to be jackhammered to remove it. I can only imagine they were talking about the sidewalk itself. The functional plans show the curb as it is placed now, so it isn't a screwup on Grandlinq. We will see what they do, or if the city/region will have to correct it after.
Posts: 1,095
Threads: 2
Joined: Aug 2014
Reputation:
33
Rode Edinburgh's tram tonight. It picks up a decent speed on the segregated tracks heading west from downtown (between Murrayfield station and Balgreen was the section I rode - might be faster further west towards the airport. Look forward to the same feeling of "whee!" on the 70kph sections in KW.
Posts: 6,693
Threads: 38
Joined: Aug 2014
Reputation:
118
(09-21-2016, 04:31 PM)timio Wrote: Rode Edinburgh's tram tonight. It picks up a decent speed on the segregated tracks heading west from downtown (between Murrayfield station and Balgreen was the section I rode - might be faster further west towards the airport. Look forward to the same feeling of "whee!" on the 70kph sections in KW.
I was in Edinburgh two weeks ago and saw the tram, but didn't get a chance to use it. I was surprised at how quiet the trains were as they passed by. Also surprised to see nada in the Leith Road when it was all torn up for tram construction when I was there a number of years ago. I gather Edinburgh is a good example of how NOT to build an LRT.
Posts: 4,600
Threads: 16
Joined: Aug 2014
Reputation:
150
(09-21-2016, 06:30 PM)panamaniac Wrote: [quote pid='26914' dateline='1474489889']
I gather Edinburgh is a good example of how NOT to build an LRT.
[/quote]
That one was definitely a Murphy's Law project - everything that could go wrong, did.
Posts: 1,221
Threads: 0
Joined: Mar 2015
Reputation:
40
The Record is reporting that University Avenue will be closed for "corrosion protection work". First of all, is this the reason why both Seagram and Bearinger had to be closed? Second, what is "corrosion protection work"?
Posts: 2,015
Threads: 11
Joined: Oct 2014
Reputation:
77
09-21-2016, 09:33 PM
(This post was last modified: 09-21-2016, 09:38 PM by Pheidippides.)
What are the orange supports for? Room to plant trees and let them grow?
Answer to my question was in this week's update:
Work to remove and replace sidewalks and install soil cells for the new trees is underway on the west side of King between William and Willis Way. This work required the sidewalk on the west side of King, from the LCBO to Scotia Bank, to close on September 13 for approximately three weeks. Signage is in place to direct pedestrians through the Waterloo Town Square South Parking Lot with access maintained to Scotia Bank and the LCBO
Everyone move to the back of the bus and we all get home faster.
Posts: 1,227
Threads: 6
Joined: Oct 2014
Reputation:
31
(09-21-2016, 07:41 PM)timc Wrote: The Record is reporting that University Avenue will be closed for "corrosion protection work". First of all, is this the reason why both Seagram and Bearinger had to be closed? Second, what is "corrosion protection work"?
Yes, and it is some sort of treatment to protect the rails from salt corrosion.
Posts: 180
Threads: 2
Joined: Aug 2014
Reputation:
23
(09-21-2016, 12:47 PM)jeremyroman Wrote: (09-20-2016, 01:38 PM)Markster Wrote: For those not on Twitter, it looks like I've caused a ruckus again.
<blockquote class="twitter-tweet" data-lang="en"><p lang="en" dir="ltr">Say hello to Queen St's new ridiculous pedestrian bottleneck <a href="https://t.co/2WdY9Vnwm8">pic.twitter.com/2WdY9Vnwm8</a></p>— Mark Jackson-Brown (@Markster3000) <a href="https://twitter.com/Markster3000/status/777613091743866880">September 18, 2016</a></blockquote>
CTV Kitchener's updated story says it's not permanent:
http://kitchener.ctvnews.ca/small-sidewa...-1.3080831
Can that post be put onto the Charles part of the intersection instead of right at the corner?
Posts: 625
Threads: 4
Joined: Jul 2016
Reputation:
22
Does anyone have any more updates on how other streetscapes are coming along? Any new wider sidewalks appearing somewhere? I noticed that Victoria from Charles to King, next to School of Pharmacy is much wider, I wonder how it will be treated? It's a very significant piece of pedestrian realm.
Posts: 47
Threads: 0
Joined: Nov 2014
Reputation:
-1
(09-21-2016, 09:33 PM)Pheidippides Wrote: What are the orange supports for? Room to plant trees and let them grow? Are these the first silva cells in Waterloo Region?
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
Yeah, what are these plant/tree things? I've never heard of them.
urbd - On my next trip out, I'll be mindful to take some photos of the various sidewalk changes.
Posts: 47
Threads: 0
Joined: Nov 2014
Reputation:
-1
(09-22-2016, 11:11 AM)Canard Wrote: Yeah, what are these plant/tree things? I've never heard of them.
urbd - On my next trip out, I'll be mindful to take some photos of the various sidewalk changes.
If they are silva cells, they're a new method of planting street trees that allows the roots to spread out, and they often result in better, hardier trees, and faster growth. Also, works as another stormwater drainage method via the passive watering of trees.
These are the trees in front of Corus Quay this year in downtown Toronto. Here is what they were like two years ago.
Posts: 2,506
Threads: 9
Joined: Aug 2014
Reputation:
74
(09-22-2016, 10:59 AM)DKsan Wrote: Are these the first silva cells in Waterloo Region?
They were used outside of the new courthouse, too.
Posts: 395
Threads: 1
Joined: Sep 2014
Reputation:
9
(09-22-2016, 10:50 AM)urbd Wrote: Does anyone have any more updates on how other streetscapes are coming along? Any new wider sidewalks appearing somewhere? I noticed that Victoria from Charles to King, next to School of Pharmacy is much wider, I wonder how it will be treated? It's a very significant piece of pedestrian realm.
There are wide multi-use (?) sidewalks installed on the west side of Caroline from William to Allen with some of the final top soil already being brought up to grade. Very nice.
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
My only wish, as a recreational cyclist, is that signage will be added designating these routes as such (Multi-Use Trails). I would happily use them if they were (signposted), but will not ride on them their current state, and instead stay on the road, because I don't want to make anyone angry if there is any confusion as to wether or not they're actually just reaaaaaly wide sidewalks.
They actually continue well past William, past the Willis Way station as well.
|