(09-15-2015, 09:19 AM)chutten Wrote: (09-14-2015, 09:42 PM)Canard Wrote: I think Erb/Caroline, Northfied/King North, and King/Victoria will be the most impressive intersection construction projects to watch out for. So much volume through all 3 of those (especially Northfield/King North).
Simply the widening+services work going on in the stretch of Northfield from Colby to King has been an absolute nightmare, Westbound. Eastbound is always easier as people wanting to head North can take the 85 and South can take Conestogo Road behind Kraus Carpets.
King & Northfield being down for days? Ick. Very ick. Not relishing any of the Northfield work from a traffic point-of-view, but that intersection especially.
It's going to be worth it, but growing pains suck.
Cycling across Northfield is exciting in the best of conditions. Running the gauntlet lately has been a challenge. Is there a planned full closure?
Posts: 1,227
Threads: 6
Joined: Oct 2014
Reputation:
31
(09-12-2015, 11:28 AM)Canard Wrote: The use of wooden ties makes me believe this is just temporary...
Drove past Columbia today and the Northbound track now presently turns and connects to the Southbound track there. I am assuming this is where the wooden ties were laid down and it is thus definitely a temporary arrangement.
Posts: 1,103
Threads: 3
Joined: Aug 2015
Reputation:
60
With KW Hydro "Relocating the existing pole lines" between Union and Green, does that mean they will be burying the hydro wires? The construction updates claim they are installing "ductwork" starting today. I would imagine that if they were simply moving the poles, it would have been done at the beginning of all the utility work, like it was on Charles and most other sections.
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
"Ductwork" would sort of suggest it's being moved underground.
I can't find a Green Street anywhere on my map - nowhere near Union... what am I missing? I assume this is along King Street near the hospital?
Posts: 4,483
Threads: 1
Joined: May 2015
Reputation:
212
(09-16-2015, 04:19 PM)Canard Wrote: "Ductwork" would sort of suggest it's being moved underground.
I can't find a Green Street anywhere on my map - nowhere near Union... what am I missing? I assume this is along King Street near the hospital?
Immediately East (Kitchener East!) of the hospital. It only runs from King to Park so it’s easy to miss.
Re: ductwork, I saw them putting in some beside the LRT on campus and they seem to be running 16 conduits. The concrete boxes have openings in a 4x4 grid. I’d be interested to know what they all are — I can think of a few possibilities e.g., traction power, signal power, signals, lighting, …, but I can’t get to 16.
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
Probably lots of spares
Posts: 4,600
Threads: 16
Joined: Aug 2014
Reputation:
150
(09-16-2015, 04:54 PM)ijmorlan Wrote: Re: ductwork, I saw them putting in some beside the LRT on campus and they seem to be running 16 conduits. The concrete boxes have openings in a 4x4 grid.
Saw a number of the same boxes on Charles by Cedar.
Posts: 2,015
Threads: 11
Joined: Oct 2014
Reputation:
77
I am having trouble understanding the final design plan for the Laurier-Waterloo Park station.
This is a view from the former path looking north toward Seagram. It looks like they are building a stormwater pond right where I would expect steps down from the station to the path - based on the last drawings I saw - or a regrading to provide for a ramp instead.
No 6-month update in the council agenda for next week either.
Also, I am wondering if the King underpass will be able to meet the 18 month closure window. I think it closed March 23, 2015 which means they expected it to reopen in September of 2016, but they haven't even started yet. The Weber underpass was 18 months of steady work (June 2013 to Dec 2014) and still has incomplete elements nearly a year later, and the King job seems much bigger and more complicated, although the need to keep it open like they did for Weber is not present which should speed things a bit.
Everyone move to the back of the bus and we all get home faster.
Posts: 1,103
Threads: 3
Joined: Aug 2015
Reputation:
60
(09-18-2015, 09:09 PM)Pheidippides Wrote: Also, I am wondering if the King underpass will be able to meet the 18 month closure window. I think it closed March 23, 2015 which means they expected it to reopen in September of 2016, but they haven't even started yet. The Weber underpass was 18 months of steady work (June 2013 to Dec 2014) and still has incomplete elements nearly a year later, and the King job seems much bigger and more complicated, although the need to keep it open like they did for Weber is not present which should speed things a bit.
You've got the dates mixed up — the road is scheduled to be closed until December of next year, which is 3 extra months than the September that you were thinking
Walked down King from Green - Union tonight to check out the road. Looking very spiffy! Especially the retaining walls in front of the church / KCI, will look great when they are finished. Only thing I'm questioning is the King St entrance to the hospital; the plans indicate it's supposed to be closed (and it would make sense, considering that's where the station will be), but the new curbs they've installed leave an opening for vehicle access. 2 of them, actually! A 2 lane entrance, and a 1 lane entrance about 10 meters North of it (though this one has no vehicle/pavement ramp leading up to it on the hospital side, like the 2 lane one does — possibly a pedestrian crossing to get to the station in the median of the road.)
Were plans changed, or will they be demolishing the curbs here to RE-repave them without the entrance?
And aside: It seems like the reason only the southbound side was paved was probably because of the underground installation of the hydro — the northbound side will likely be paved following the completion of that.
Posts: 10,840
Threads: 67
Joined: Sep 2014
Reputation:
392
Maybe an entrance for emergency vehicles only?
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
09-18-2015, 10:28 PM
(This post was last modified: 09-18-2015, 10:30 PM by Canard.)
(09-18-2015, 09:09 PM)Pheidippides Wrote: I think it closed March 23, 2015 which means they expected it to reopen in September of 2016, but they haven't even started yet.
King Street "closed" around March or so, but you could still drive over the tracks. They only finally terminated all access across the tracks a few weeks ago. They had a 3-week period where they had to wait between the closing and any work, as per Transport Canada regulations, and they also probably have to wait for the new tail track switch on Park to be completed for GO before they can do any work at the underpass. They're probably also doing lots of "invisible" work that just isn't so obvious.
I too am confused by the Seagram setup. There are lots of spots though along the line that I'm finding are quite a bit different from what I would have expected to see, based on the plans. I've had a tab opened permanently on my phone with the Region's PDF's for the Functional Design Plans for a year or two now.
Posts: 2,015
Threads: 11
Joined: Oct 2014
Reputation:
77
(09-18-2015, 09:25 PM)GtwoK Wrote: (09-18-2015, 09:09 PM)Pheidippides Wrote: Also, I am wondering if the King underpass will be able to meet the 18 month closure window. I think it closed March 23, 2015 which means they expected it to reopen in September of 2016, but they haven't even started yet. The Weber underpass was 18 months of steady work (June 2013 to Dec 2014) and still has incomplete elements nearly a year later, and the King job seems much bigger and more complicated, although the need to keep it open like they did for Weber is not present which should speed things a bit.
You've got the dates mixed up — the road is scheduled to be closed until December of next year, which is 3 extra months than the September that you were thinking 
You are correct. The dates I was looking at in different articles and reports referenced the March 23, 2015 closure, but looking at the rideion tumblr feed the intersection didn't actually close until June 8, 2015. This actually re-affirms my thought that the "late 2016" completion won't be met. The start dates may have shifted, but one thing that has remained consistent is that it is an 18 month project, so whether they start digging in March, June, or September 2015 it is scheduled to take 18 months which would currently put the project into 2017-Q1 completion.
Driving down Strange this evening it looked like traffic was moving across the tracks at Park again.
Everyone move to the back of the bus and we all get home faster.
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
09-19-2015, 07:51 AM
(This post was last modified: 09-19-2015, 08:05 AM by Canard.)
(09-13-2015, 02:18 PM)timio Wrote: Lot X is free on weekends (North of Optometry)
Sorry to be a pain, but are you able to tell me which lot is Lot X? I just arbitrarily gave these numbers, for identification purposes - "A" is where I parked before, which was metered parking:
Additionally, here's a pretty good video from CTV, highlighting some of the Waterloo construction: http://kitchener.ctvnews.ca/video?clipId=707119
Posts: 4,483
Threads: 1
Joined: May 2015
Reputation:
212
(09-19-2015, 07:51 AM)Canard Wrote: (09-13-2015, 02:18 PM)timio Wrote: Lot X is free on weekends (North of Optometry)
Sorry to be a pain, but are you able to tell me which lot is Lot X? I just arbitrarily gave these numbers, for identification purposes - "A" is where I parked before, which was metered parking:
Additionally, here's a pretty good video from CTV, highlighting some of the Waterloo construction: http://kitchener.ctvnews.ca/video?clipId=707119
https://uwaterloo.ca/map/?basemap=D#map=...8/-80.5401
… and turn on the “Visitor Parking” layer.
Posts: 1,095
Threads: 2
Joined: Aug 2014
Reputation:
33
(09-19-2015, 07:51 AM)Canard Wrote: (09-13-2015, 02:18 PM)timio Wrote: Lot X is free on weekends (North of Optometry) Sorry to be a pain, but are you able to tell me which lot is Lot X? I just arbitrarily gave these numbers, for identification purposes - "A" is where I parked before, which was metered parking:
D/E are Lot X
|