In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
20 University Ave E | 25 fl | Proposed
#16
(05-06-2025, 08:57 PM)Vojnik_Vahaj Wrote: Wait, if that to keep the basement levels from flooding, where does all that water go?

It depends on the site. In situations where the site is large enough (generally new subdivisions) the water can be pumped to a different area of the site so servicing, SWM pond lining or whatever other works requiring pumping can be completed. In more urban environments such as this it tends to be pumped directly into the storm sewer.

Keep in mind the dewatering system is not permanent, once the building is large enough to withstand the hydrostatic uplift force from the ground water table it will be gradually decommissioned and the ground water table will return to its normal levels. Once construction is complete you'll also have a sump pump which is connected to the storm sewer to regulate water around the foundation of the building.
Reply


#17
(05-06-2025, 10:24 PM)ZEBuilder Wrote:
(05-06-2025, 08:57 PM)Vojnik_Vahaj Wrote: Wait, if that to keep the basement levels from flooding, where does all that water go?

It depends on the site. In situations where the site is large enough (generally new subdivisions) the water can be pumped to a different area of the site so servicing, SWM pond lining or whatever other works requiring pumping can be completed. In more urban environments such as this it tends to be pumped directly into the storm sewer.

Keep in mind the dewatering system is not permanent, once the building is large enough to withstand the hydrostatic uplift force from the ground water table it will be gradually decommissioned and the ground water table will return to its normal levels. Once construction is complete you'll also have a sump pump which is connected to the storm sewer to regulate water around the foundation of the building.
Oh ok cool. Thanks for the explanation
Galatians 4:16
Reply
#18
The tower crane is up and foundation rebar has started. It's not very deep, there must not be any underground parking.
Reply
#19
(07-10-2025, 01:40 PM)mastermind Wrote: The tower crane is up and foundation rebar has started.  It's not very deep, there must not be any underground parking.

The parking is all in the podium on this one, there will be retail units fronting University and Regina, with the lobby off of Regina. Parking is then found in floors 1-5, as well as a mezzanine level between floors 1 and 2 (they call it level 1 upper).
Reply
« Next Oldest | Next Newest »



Forum Jump:


Users browsing this thread: 1 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links