In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Housing shortfall, costs and affordability
(11-24-2025, 10:39 AM)tomh009 Wrote: Marc Morin (ex PixStream and Sandvine) is pushing to make factory-built housing at scale:
https://www.therecord.com/news/waterloo-...39e4c.html

This will be interesting to see if it takes.  There have been some similar attempts in the past and nothing has really taken off yet as far as I can tell.

I love how they say "an empty lot in the morning will be a near-finished housing development by the end of the day with the help of a crane".  What about the foundation?  And once the prefab house is installed, what about services and landscaping, and probably a roof?  I mean technically they did say "near-finished" but their statement is a little bit over the top.
Reply


(01-14-2026, 09:15 AM)mastermind Wrote:
(11-24-2025, 10:39 AM)tomh009 Wrote: Marc Morin (ex PixStream and Sandvine) is pushing to make factory-built housing at scale:
https://www.therecord.com/news/waterloo-...39e4c.html

This will be interesting to see if it takes.  There have been some similar attempts in the past and nothing has really taken off yet as far as I can tell.

I love how they say "an empty lot in the morning will be a near-finished housing development by the end of the day with the help of a crane".  What about the foundation?  And once the prefab house is installed, what about services and landscaping, and probably a roof?  I mean technically they did say "near-finished" but their statement is a little bit over the top.

That's fair - it is really the stacking/assembly is done in under a day. So a the empty lot should read as an empty foundation. Services are all done prior to stacking (similarly with landscaping usually) and the roof is installed in the factory. There's roughly 4 weeks of work done prior to the one-day stacking. Still much quicker and less distruptive than traditional construction.
Reply
(01-14-2026, 03:51 PM)CabinovoHousing Wrote:
(01-14-2026, 09:15 AM)mastermind Wrote: This will be interesting to see if it takes.  There have been some similar attempts in the past and nothing has really taken off yet as far as I can tell.

I love how they say "an empty lot in the morning will be a near-finished housing development by the end of the day with the help of a crane".  What about the foundation?  And once the prefab house is installed, what about services and landscaping, and probably a roof?  I mean technically they did say "near-finished" but their statement is a little bit over the top.

That's fair - it is really the stacking/assembly is done in under a day. So a the empty lot should read as an empty foundation. Services are all done prior to stacking (similarly with landscaping usually) and the roof is installed in the factory. There's roughly 4 weeks of work done prior to the one-day stacking. Still much quicker and less distruptive than traditional construction.

Makes sense.  Less construction time for the neighbours to experience for sure.  When will we get to see a few get built and see how they perform.
Reply
(01-21-2026, 09:48 AM)mastermind Wrote:
(01-14-2026, 03:51 PM)CabinovoHousing Wrote: That's fair - it is really the stacking/assembly is done in under a day. So a the empty lot should read as an empty foundation. Services are all done prior to stacking (similarly with landscaping usually) and the roof is installed in the factory. There's roughly 4 weeks of work done prior to the one-day stacking. Still much quicker and less distruptive than traditional construction.

Makes sense.  Less construction time for the neighbours to experience for sure.  When will we get to see a few get built and see how they perform.

We've completed ~18 units, just waiting on a final building permit.
Reply
« Next Oldest | Next Newest »



Forum Jump:


Users browsing this thread: 3 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links