In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 16 Vote(s) - 4 Average
  • 1
  • 2
  • 3
  • 4
  • 5
ION - Waterloo Region's Light Rail Transit
Another unfortunate utility box placement, this time at King and William at the edge of the public square:
   
   

There must be an engineering reason for these types of utility boxes not to have been placed more logically; I mean it can't be the expense of moving them 1m or 2m that's stopping them (especially in the grand scheme of the total project cost).


Question: Wouldn't it be best, at this point, to wait and see if the first train fits the platforms as Bombardier has promised their design will instead of shaving millimetres off everywhere?
Everyone move to the back of the bus and we all get home faster.
Reply


No, because engineering is not "trial and error". There's a reason for tolerances. If a company subcontracts the build of their design (as is here) and it's out of tolerance, it's up to that supplier to correct their mistake.
Reply
(10-28-2016, 08:00 AM)Pheidippides Wrote: Another unfortunate utility box placement, this time at King and William at the edge of the public square:

There must be an engineering reason for these types of utility boxes not to have been placed more logically; I mean it can't be the expense of moving them 1m or 2m that's stopping them (especially in the grand scheme of the total project cost).

No there doesn’t. They might just not care.

At UW they closed the upper level of the DC-MC bridge for about a year when M3 was built, in order to tie in the M3 bridge. Yes, you heard right, a full year. It is simply not credible that they actually needed to do that — except for removing some of the baseboard heaters and adjusting the floor grade, the work didn’t even touch anything except the wall facing M3. So they could have closed for a couple (OK, I’ll be generous, and say “a few”) weeks to adjust the heaters and the floor, then built construction hoarding to narrow the hallway down for the remaining time required to open up the wall and complete the bridge.

Sometimes the designers just aren’t looking at all the criteria they should be.

Having said that, it is certainly possible that the utility box placement is more constrained than seems obvious.
Reply
Sometimes outside observers and "armchair engineers" have no idea what kind of restrictions a designer/engineer was given. It's impossible for any of us to understand or know the dozens of factors that went into why that box is where it is.

If there's one thing I've learned over my 15 year career as a designer it's that no matter what you do, someone's going to be pissed off at you
Reply
At the same time, engineers are often completely oblivious about factors they aren't directly concerned with. It's ultimately a management issue concerning integrating necessary stakeholders early enough in the design process.
Reply
We generally know all the factors. You have to make decisions about which ones trump others, what your budgets or constraints allow, and then move forward - often knowing that someone won't be happy with the end result.

What, for example, could designers possibly do at the corner of Queen/Charles? There is literally no practical solution there.
Reply
I was at City Café today.  Spoke with the construction workers.  They advised that the embedded rails at Ottawa onto Charles will be poured on Tuesday.
Reply


(10-28-2016, 12:12 PM)Canard Wrote: We generally know all the factors. You have to make decisions about which ones trump others, what your budgets or constraints allow, and then move forward - often knowing that someone won't be happy with the end result.

What, for example, could designers possibly do at the corner of Queen/Charles? There is literally no practical solution there.

They could have done exactly the same thing that was done at Queen and Duke, square off the corner, as described here:

http://www.tritag.ca/blog/2016/09/19/thi...oo-region/

It is practical to reduce the turning radius (prioritize pedestrians over trucks) on a one of the busiest pedestrian intersections in the city.
Reply
(10-28-2016, 12:00 PM)Canard Wrote: If there's one thing I've learned over my 15 year career as a designer it's that no matter what you do, someone's going to be pissed off at you

[Image: workflow.png]
Reply
Concrete poured today for the embedded track in uptown waterloo from the HSBC down to the Gospel Light shop. Based on the forms in looks like they will pour down to the Works restaurant by end of day.
Everyone move to the back of the bus and we all get home faster.
Reply
1/3 - Friday, October 28, 2016

   
Thanks to a tip from Tom Galloway on Twitter, I rushed home after work and jumped on my bike to head up to UpTown Waterloo, before things got too late tonight.

   
Progress is being made here!

   
This guy looks like he's having fun.  Smile

   
These guys reminded me of the folks who bring in the giant flag at the beginning of the Olympics.

   
Reply
2/3 - Friday, October 28, 2016

   
Some minor rework at King/William.

   

   
Platform edge rework at Allen.  The forms are built differently, now - anchored at frequent intervals to the existing concrete, with threaded adjusters for fine positioning.

   
Crossover components are now being roughly laid out at KCI.

   
I imagine once the guys are done down at the crossover at Cameron Heights, they'll move over here.
Reply
3/3 - Friday, October 28, 2016

   
KCI Crossover, continued...

   

   
Looks like there are some footers under those orange tarps at the King St. Grade Separation - there was definitely some topside infra going in, despite the presence of some big wastewater pipes over there on the right.

   

   
Thanks to Tom Galloway for the tip to use the McDonald's staircase/entrance to get some of these shots!
Reply


The LRT train signals were on today between Bearinger Road and University.
Reply
Duke and Water has reopened
Reply
« Next Oldest | Next Newest »



Forum Jump:


Users browsing this thread: 106 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links