(11-07-2017, 10:43 PM)Canard Wrote: Signals were likely being manually dropped by the OnTrack safety folks who were chasing the train from intersection to intersection.
@Coke - I am so sorry - you know how I am with directions and geography!
It's more like they were moving too slow for an accurate timing based on the track circuits.
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
Yeah... which is why they were not operating automatically, and were operated manually.
Posts: 667
Threads: 0
Joined: Feb 2017
Reputation:
26
(11-08-2017, 08:31 AM)Canard Wrote: Yeah... which is why they were not operating automatically, and were operated manually.
And also why they had a police escort
Posts: 667
Threads: 0
Joined: Feb 2017
Reputation:
26
Northbound Track will be tested today!!
Posts: 4,340
Threads: 1
Joined: May 2015
Reputation:
180
(11-08-2017, 08:52 AM)trainspotter139 Wrote: Northbound Track will be tested today!!
I wonder when they will test the crossovers?
Posts: 810
Threads: 5
Joined: Nov 2015
Reputation:
39
Posts: 4,340
Threads: 1
Joined: May 2015
Reputation:
180
(11-08-2017, 11:32 AM)Bob_McBob Wrote: 'Everything was positive,' ION light rail car completes first testing
Just saw it in front of UW, on the northbound track (although still heading south).
Does anybody know exactly how far south they are going? Do they stop just shy of the Erb/Caroline intersection?
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
The original plan was to go that far South, yes.
The idea was that they'd use the freight crossover for LRV's during burn-in, as their bums will stick out into the intersection if they use the LRV crossover, which is further South. As a result, a temporary strand of OCS is wired up, with wooden poles, over the freight crossover.
I wrote up a post with photos and diagrams explaining this some time back, I'll dig around and see if I can find it, and link it here.
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
11-08-2017, 01:19 PM
(This post was last modified: 11-08-2017, 01:20 PM by Canard.)
So, I can't find the post, so here's a brief description with the diagrams I had made up to go with it.
Here's the layout in that area:
Here's the path freight takes (note that freight must always cross over to the SB LRT tracks - because those are the only ones with gauntlet tracks installed):
Here's the path LRV's take, in normal operation:
Look on the left; you can see two half-crossovers. Freight uses the one on the far left, LRV's use the one on the right, closer to the intersection. They are different types - freight can only use the one at the far left (further North). LRV's can use both, from a wheel-interface standpoint, but in normal operation (beyond testing) they'll only ever use the one at the right - which is the only one fitted with permanent contact wire. The temporary contact wire strung above the freight crossover allows LRVs to turn back without blocking the intersection.
Hope that makes sense!
Posts: 605
Threads: 0
Joined: Nov 2016
Reputation:
78
11-08-2017, 01:20 PM
(This post was last modified: 11-08-2017, 01:21 PM by KevinT.)
(11-07-2017, 01:34 PM)chutten Wrote: Thanks for the link, Markster. I don't do the faceboo thing, so it's a helpful reference for me.
All the videos I posted to the Facebook group yesterday have also now been uploaded to YouTube:
YouTube: Ion LRT Push Test Playlist
...K
Posts: 2,163
Threads: 17
Joined: Sep 2014
Reputation:
76
Posing at a jaunty angle
<blockquote class="twitter-tweet" data-lang="en"><p lang="en" dir="ltr">Well hello there <a href="https://twitter.com/rideIONrt?ref_src=twsrc%5Etfw">@rideIONrt</a> <a href="https://twitter.com/RegionWaterloo?ref_src=twsrc%5Etfw">@RegionWaterloo</a> <a href="https://t.co/1yTEC36HP9">pic.twitter.com/1yTEC36HP9</a></p>— Chris Lolas (@crlolas) <a href="https://twitter.com/crlolas/status/928313126898094081?ref_src=twsrc%5Etfw">November 8, 2017</a></blockquote>
Posts: 1,191
Threads: 0
Joined: Mar 2015
Reputation:
34
I believe the clock in that photograph hasn't been set back for the fall yet.
Posts: 141
Threads: 2
Joined: Sep 2014
Reputation:
2
Flexy was coming out of the maintenance building again this morning about 10 minutes ago, are they done with clearance testing yet? I would think self powered testing could start as soon as the track is cleared.
Posts: 1,191
Threads: 0
Joined: Mar 2015
Reputation:
34
As of yesterday, I don't think the power was on. I suppose that could change, but so soon?
|