Without seeing any official dates, I have to think that all of us thinking they're behind is just speculation. No one's raising any red flags just yet. The only thing I've seen GrandLinq openly come out and say is that they ran into some trouble at Gaukel, because they discovered a whole bunch of crap that wasn't in their drawings. Same thing happened in Cambridge at one of the aBRT stops.
Posts: 2,003
Threads: 7
Joined: Sep 2014
Reputation:
124
It seemed to me that work along Caroline was stalled for a very long time. Have they actually been doing work the entire time, because it seemed to me that months went by without anything happening but the road still being closed off.
Posts: 1,085
Threads: 2
Joined: Aug 2014
Reputation:
31
06-17-2015, 07:06 AM
(This post was last modified: 06-17-2015, 07:07 AM by timio.)
Had winter not hit in full force from mid-November through mid-March (with the exception of the Christmas Eve thunderstorm), they would likely be farther along. The ground was probably quite frozen when they started up again in March which would slow down work quite a bit, one would guess.
One of the joys of living in Canada.
Posts: 1,085
Threads: 2
Joined: Aug 2014
Reputation:
31
They seem to be done the sewer work at William and Caroline and are now working water pipes.
There was some sort of digging going on at Willis Way this morning but it was on the other side of the street, so I couldn't get a closer look.