In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 16 Vote(s) - 4 Average
  • 1
  • 2
  • 3
  • 4
  • 5
ION - Waterloo Region's Light Rail Transit
(11-19-2020, 12:01 PM)ac3r Wrote: The LRT was awarded a national award: https://www.keolis.ca/fr/lexcellence-du-...u-canadien

Thanks! English version here: Smile
https://www.keolis.ca/en/excellence-new-...onal-level
Reply


Oops, didn't realize I had linked the French version! Mais...nous l'apprenons tous passionnément pendant de nombreuses années à l'école, no? :')
Reply
(11-19-2020, 01:10 PM)ac3r Wrote: Oops, didn't realize I had linked the French version! Mais...nous l'apprenons tous passionnément pendant de nombreuses années à l'école, no? :')

Unfortunately, not everyone takes french beyond grade 9.
Reply
(11-19-2020, 12:28 PM)tomh009 Wrote:
(11-19-2020, 12:01 PM)ac3r Wrote: The LRT was awarded a national award: https://www.keolis.ca/fr/lexcellence-du-...u-canadien

Thanks! English version here: Smile
https://www.keolis.ca/en/excellence-new-...onal-level

Still coming up in French only for me. Weird. I didn't realize the Keolis was a French company. Now I know.

I can read some French, not very good at it, though I got the gist.
Reply
(11-19-2020, 01:10 PM)ac3r Wrote: Oops, didn't realize I had linked the French version! Mais...nous l'apprenons tous passionnément pendant de nombreuses années à l'école, no? :')

Certains d'entre nous sont québeçois d'origine.
Reply
(11-19-2020, 03:34 PM)jeffster Wrote: I didn't realize the Keolis was a French company. Now I know.

They're a 'French company' in the deepest sense... owned by France's national railway, SNCF.
Reply
The Press Release Wrote:With Cambridge stops to be added within a few years.

Well that's good news! Much faster than I was expecting!

Coke
Reply


Well stage 2 hasn't yet been confirmed I believe, but I sincerely doubt Cambridge will vote against it. It's the only thing that could save that place.
Reply
I heard it wouldn’t be coming till 2025 or 2028? I low key already want a new line going thru king/Columbia and st jacobs farmers market (this one is more like a wishful hope).
Reply
(11-24-2020, 10:30 PM)catarctica Wrote: I heard it wouldn’t be coming till 2025 or 2028? I low key already want a new line going thru king/Columbia and st jacobs farmers market (this one is more like a wishful hope).

I know the OG plan was to have it run to St. Jacobs Farmers Market, and I believe, to the Galt Terminal. The 2nd Line was suppose to be along Victoria from roughly IRA and Bingemans (Lackner).
Reply
(11-25-2020, 03:43 AM)jeffster Wrote: I know the OG plan was to have it run to St. Jacobs Farmers Market, and I believe, to the Galt Terminal.

Not quite. That was only the potential maximum. The studies looked along the Region's entire Central Transit Corridor to see where it was likely to be needed, based on job & resident density, public transit use, and what residents thought of the route. The route from St. Jacobs to Ainslie was still in the 2011 documents as option L9, but if you go through everything you can see that how after 2007 most of the effort was focused on what in 2011 was called option L3 and which is what we got. But until 2011 there was no plan to have it run anywhere as it was still all hypothetical before then.

(11-25-2020, 03:43 AM)jeffster Wrote: The 2nd Line was suppose to be along Victoria from roughly IRA and Bingemans (Lackner).

In the original planning process that went on from 2004 to 2014, Victoria St. was never considered as area under consideration was only the CTC.

Are you thinking of the "Moving Forward: 2018 Master Transportation Plan" documents that mention Erb/University/King and Highland/Victoria as hypothetical ION Stage 3 after 2041?
Reply
(11-24-2020, 10:30 PM)catarctica Wrote: I heard it wouldn’t be coming till 2025 or 2028? I low key already want a new line going thru king/Columbia and st jacobs farmers market (this one is more like a wishful hope).

When Stage one was finished, and we went through 2 years of "any day now" thanks to Bombardier, the quasi-official word from councillors and senior staff when asked was that the earliest Stage 2 would be started was 2025 based on ability to get funding from senior levels of government in a timely manner, and how fast ridership along the 302 would increase. 2028 is the new date given recently and seems to be merely a simple adjustment based on the Bombardier-induced delays in starting operations, and now CoViD-19 their effects on ridership.

Left unstated, however, has been what those ridership targets are that would trigger the process to move into final route plans, start expropriations, order more trams, open up RFQ and then RFP, and then finally construction. (Assuming funding is there, of course.)

Depending on local conditions, including like salaries for your staff, fuel/energy costs, etc…, LRTs become competitive with bus routes on an operational cost per ride somewhere between 5,000 and 10,000 boardings per day, usually around 7,000, and outperform about 25-50% later. We left implementing our LRT until significantly later. As recently as 2018, the Region had been hinting that it would not wait as long in terms of the 302 getting crowded as it had for the iXpress 200 and 7, and that it might even be willing to do it slightly before it was fully viable in terms of that operating cost per ride. Those hints were always couched in terms of hurrying along densification being worth Stage 2 underperforming for a few years. Reading between the lines between of what local politicians said on the record or in just talking to people, a lot of people felt the Region was implying that it would do so in order to pacify Cambridge. After all, Cambriding having had to pay the extra property tax levies for Stage 1 while only being indirectly served by it is an undeniable political hot potato. Also, the usual 7% average annual growth for GRT ridership that is mentioned in Regional transportation documents wouldn't put what is now route 302 over 5,000/day until 2026  and over 10,000/d day until 2036, and that was seen by some as more evidence that Stage 2 would be built before it was viable in terms of that operational cost. (Numbers given to me by GRT for 2015-2018 showed an average of 10% annual growth, which would have brought the 302 to just under 6,500/day in 2025, do not know what recent, precoid numbers were.)

Maybe it's just me being cynical, but I think we have at least 2 and probably 3 municipal elections to go before we see a council authorise an RFQ for Stage 2 construction, because even if they get funding I cannot see political appetites (i.e., getting reelected) before the 302 reached 7,000 to 10,000 riders a day on average, likely some time after 2030. I will be highly surprised if the Council authorises Stage 2 construction at 5,000/day or fewer.
Reply
(11-27-2020, 01:24 PM)Bytor Wrote: after 2041?

For the sake of everyone in WR, I hope we build a second line before 2041...it shouldn't take a region of over 600'000 roughly half a century to simply build two "rapid" transit lines. eyerollemoji

Also, maybe this disaster that we call the ION could...you know...NOT use Bombardier for anything going forward? When is the last time you ever read anything about them that wasn't bad news? They're a terrible company. I think we only went with them because we or they or someone got some breaks if we bought Canadian, but that turned out to be a complete waste of time and money. Alstom may have had some wonky doors on the newest Otrain line, but at least they got trains in time - not 2-3 years later, incomplete with no APT and welding that was cracking after a few weeks.
Reply


(11-27-2020, 07:17 PM)ac3r Wrote: Also, maybe this disaster that we call the ION could...you know...NOT use Bombardier for anything going forward? When is the last time you ever read anything about them that wasn't bad news? They're a terrible company. I think we only went with them because we or they or someone got some breaks if we bought Canadian, but that turned out to be a complete waste of time and money. Alstom may have had some wonky doors on the newest Otrain line, but at least they got trains in time - not 2-3 years later, incomplete with no APT and welding that was cracking after a few weeks.

Well, depending on what Alstom does with Bombardier, using Bombardier in the future may not even be a choice (at least nominally). But if you think "wonky doors" is the best way to describe the O-train saga then I don't think you've been following it. The wikipedia page for the LRVs sums it up fairly well (in terms of vehicle issues, which are only part of the system's issues):

Quote:By early October 2019, the automated doors of the vehicles used by Ottawa's Confederation Line experienced faults if pried open or held back by passengers; this resulted in numerous service disruptions, some lasting up to 90 minutes due to a lack of proper procedures to isolate and disable the faulty doors while a train was in service. The vehicles also began encountering integration issues with Thales' SelTrac train control system that led to the on-board computer for some trains in service needing to be rebooted, causing delays of up to 20 to 30 minutes.[10]

Reliability gradually improved in November and December 2019. However, on December 31, 2019, electrical problems caused by improperly cleaned electrical contacts on the roof of the trains caused disruptions to passengers.[11][12] Then, throughout January 2020, service continued to suffer due to a combination of train and track switch failures. The trains' interior heating systems have been reported to be insufficient in Ottawa's sub-zero winter temperatures, forcing OC Transpo to consider adding heaters to the vehicles.[13] A manufacturing defect with the inductors used by the vehicles led to numerous electrical failures in inclement weather.[14] On January 30, 2020, the Confederation Line reached an all-time operational low when it was short five trains due to "recurring mechanical and electrical issues". Only eight to nine trains ran during the day.[15] The Confederation Line is expected to field 13 working trains during rush hour.

On July 2, 2020, cracks were found on two wheels of a vehicle during routine maintenance activities. A subsequent inspection of all vehicles found two more wheels with cracks, for a total of four across three different vehicles. As a result, half of the fleet is currently kept out of service each day so that every wheel on each vehicle can be inspected before the vehicle can be put back into service. On July 10, 2020, the Transportation Safety Board of Canada launched an independent investigation into the matter.[16] On September 16, 2020, the City announced that Alstom had determined that the root cause of the issue was an improperly aligned screw that caused stress on the wheel, resulting in the cracks. Alstom said it would replace every wheel in the fleet by early 2021.

If I'm not mistaken, a big part of why we chose the vehicles we did was to piggy-back on Toronto's order. Perhaps ironically, Toronto has ordered some of the same vehicles as Ottawa now because they fear Bombardier won't fulfill their order in time.

But anyways, from cursory reading of systems around the world, it seems like delays on new/custom vehicles is the norm, not the exception.
Reply
(11-27-2020, 07:50 PM)dtkvictim Wrote:
Quote:By early October 2019, the automated doors of the vehicles used by Ottawa's Confederation Line experienced faults if pried open or held back by passengers; this resulted in numerous service disruptions, some lasting up to 90 minutes due to a lack of proper procedures to isolate and disable the faulty doors while a train was in service. The vehicles also began encountering integration issues with Thales' SelTrac train control system that led to the on-board computer for some trains in service needing to be rebooted, causing delays of up to 20 to 30 minutes.[10]

I read an article which said that any train with a door that wouldn’t close would be locked out by the ATP (automatic train protection) and could only be moved under old-school procedures essentially involving written authorization to use sections of track.

Total engineering fail; ATP has no business absolutely preventing a train from operating just because of door problems. There should be a procedure to inform the system that the door has failed, possibly install a temporary barrier, and continue on, even in service if appropriate.

What horrors lurk in the design away from areas where I can confidently assert the designers screwed up?

I hope this isn’t the way of the future: software industry practices applied to other industries. By this I mean products which, while technically meeting the spec, fail to operate in the way which anybody who actually thought about the problem for a few minutes would realize they should operate. The customer should not be responsible for thinking of all the obvious, goes-without-saying, features and putting them explicitly in the spec.
Reply
« Next Oldest | Next Newest »



Forum Jump:


Users browsing this thread: 7 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links