(04-06-2023, 08:29 PM)ZEBuilder Wrote: On the Stirling side of the expressway they've had a rotary drilling rig and a mobile crane doing work on footings for the last week. On the Strasburg side they have yet to start digging any footings but the sidewalk is closed and the prep work is complete so they should be starting soon. There is also no sign of any structural steel for the bridge yet but that should be coming soon.
I'm pretty sure I read somewhere that they'll be bringing in a lot of the pieces partially assembled, so that the bridge can go up fast once the parts are on site. There was definitely something about ensuring that a large truck would be able to navigate on both ends, to park in such a way that the bridge pieces could easily be picked up and put into place.