02-14-2017, 02:40 PM
Just had a nice walk along Charles from Stirling to Cedar, and was impressed by how finished it all looks. The Cameron crossover is in, overhead wiring is pretty much complete, and the traffic signals at Cedar are operational.
I've also got a look at the current isolators that separate one block of power from another, which are interestingly intricate (no pictures, alas). There was even a Mass Electric crew working on one near Kitchener Market station.
I've also got a look at the current isolators that separate one block of power from another, which are interestingly intricate (no pictures, alas). There was even a Mass Electric crew working on one near Kitchener Market station.