04-13-2017, 09:24 AM
It looked like the Waterloo public square anchor wall frame and other components were being offloaded this morning.
Also I wouldn't be surprised if the tracks at Allen and Caroline will need some repair by the time the excavation at 155 Caroline is done; they are taking a beating from all the loaded dump trucks taking material out of the site every few minutes.
Also I wouldn't be surprised if the tracks at Allen and Caroline will need some repair by the time the excavation at 155 Caroline is done; they are taking a beating from all the loaded dump trucks taking material out of the site every few minutes.
Everyone move to the back of the bus and we all get home faster.