11-14-2020, 06:16 PM
(11-14-2020, 05:56 PM)Square Wrote:(11-14-2020, 05:18 PM)panamaniac Wrote: What was the paln for the Gaukel closure? Temporary for the good weather, temporary for the duration of the pandemic, or temporary pending a permanent closure?IIRC, the old road closure said that the road should have opened about 2 weeks ago and permantly close in the spring 2021. (The road is still closed tho)
According to the Engage page, phase 1 (Joseph to Charles) was supposed to be done this summer. IIRC the current Gaukel setup went in at the same time as Ontario St (now removed), presumably as part of the pandemic response. Given that it certainly still looks temporary, and that phase 1 isn't checked off on Engage, the phase 1 work is still yet to happen? But it sounds like the permanent closure was supposed to happen this past summer.