03-21-2019, 10:47 AM
(03-21-2019, 10:21 AM)timc Wrote:(03-20-2019, 08:06 PM)bgb_ca Wrote: I'm sure it's easier to add supports for one now then to retrofit it afterwards without them. If they do it right, it can be easily done.
I'm no engineer or architect, but how do you properly size the supports without knowing what is going to be built?
Basically, you would make assumptions about how much additional weight you need to support. Those assumptions would then end up setting a limit on what can be built as a second phase.