The airport master plan shows proposed terminal layouts up to a capacity of 2.5M pax/year in 5 stages, below is the final version. The terminal is the hockey stick-shaped blue building, the large adjacent blue building is a parking garage.
The part of the terminal on the right is where the current terminal is, and they show the phases as progressive extensions of the longer thinner section toward Fountain St. Past 1M pax/year the plan calls for pretty much completely replacing the building though, as it becomes a 2-3 floor building with separate arrival and departure levels.
The part of the terminal on the right is where the current terminal is, and they show the phases as progressive extensions of the longer thinner section toward Fountain St. Past 1M pax/year the plan calls for pretty much completely replacing the building though, as it becomes a 2-3 floor building with separate arrival and departure levels.