(05-09-2022, 05:03 PM)taylortbb Wrote: Hard to say. I bought at Charlie West, and as I was on an upper floor I had no interim occupancy period. But at Charlie West the delay between first and final occupancy was 7 months, not 1 week. The very first units had about 4.5 of months of interim occupancy.
Van Mar seems to be doing things very differently from Momentum, so while I standby my expectation there will be some delay, I really can't say anything about how long. I'm curious how much ability to customize did you get? Momentum offers a ton, I think had to make 50+ different choices at my selection appointment, most with 5+ options. So likely no two units at Charlie West are the same, which may factor into why there's such a huge difference in unit completions. Some of the options, like paint colour, don't make a huge difference, but I had 4 different options for ceiling lighting layout which would require running significantly different wiring.
For Union Towers there were 2 standard packages, 1 “Investor Package”, “Upgrade A” and “Upgrade “B”, and then “Upgrade Ca” and “Upgrade Cb”.
Each package with its own combination of flooring, cabinetry, backsplash, hardware, paint colour, etc.
Once you selected a package, you could then select from the list of additional upgrades. While there is an upgrade for pot lights, it was a pre-determined layout.