06-21-2019, 10:00 AM
Tower ♆.
Garment Street Condos | 25 & 6 fl | U/C
|
06-21-2019, 10:00 AM
Tower ♆.
06-21-2019, 10:09 AM
07-13-2019, 11:36 AM
Hey, how is the excavation going? Does anyone have any recent photos?
07-14-2019, 02:06 PM
It looks like they are doing a staggered excavation. Hard to get a photo cause of the distance of the site and the barrier. Pilings are going in behind Huck glove
07-15-2019, 10:18 AM
A person living in the One Hundred condo already built - and with a vantage point on the one the sides that would provide a view, would probably be best positioned to snap photos!
07-15-2019, 05:43 PM
07-15-2019, 09:19 PM
I was originally told November 2020 would be earliest move-in date for Garment. At this rate, probably not even close.
07-16-2019, 01:38 AM
07-16-2019, 08:19 PM
(This post was last modified: 07-16-2019, 08:20 PM by artembunglito.)
(07-15-2019, 09:19 PM)foozlewoozle Wrote: I was originally told November 2020 would be earliest move-in date for Garment. At this rate, probably not even close. My move in date was ~8 months after they originally told me. I have doubts yours will be 2020. A silver lining was I had very few minor issues to correct with my unit.
07-18-2019, 08:46 PM
07-19-2019, 05:10 PM
Today the large pile of dirt beside Huck glove was being removed and the pile driver was putting the last piles in along the lane
07-19-2019, 11:33 PM
Great view from up there
07-26-2019, 08:30 AM
Excavation on the rear of the property is now across the Bramm St (at least one level down, probably for shoring purposes). The pile driver is no longer on site
07-27-2019, 11:39 AM
Line of dump trucks doing a Saturday excavation on site
08-03-2019, 09:19 PM
Hey does anyone have a photo of it? Thanks
|
« Next Oldest | Next Newest »
|