03-12-2024, 11:23 AM
Activa submitted new plans for the originally planned subdivision. Unfortunately the township planning department has convinced them to go away from a traditional grid system in the original plan. The new plan is a hybrid of grid/ winding roads to appease neighbourhoods of dreaded through traffic. They also reduced park space by .6 acres to squeeze in a couple extra lots.
There is also a hec of a lot of surface parking for the stacked townhouse/ apartment buildings.
https://www.engagewr.ca/activa-holdings-...est-elmira
There is also a hec of a lot of surface parking for the stacked townhouse/ apartment buildings.
https://www.engagewr.ca/activa-holdings-...est-elmira