01-21-2016, 05:42 PM
Hmm. That makes sense, then. I'm curious, the Weber grade separation allows for a 3rd rail crossing to eventually be added - there is a space left for it in the bridge framework, all that is needed is the girder. Is it the same with this overpass if cast-in-place concrete is used? Or would they be creating all 3 spans right now?