02-27-2016, 03:25 PM
The trench there in front of School of Pharmacy is simply massive. I wonder how much of that will be filled in? Obviously, the grading there is going to drop down, but I'm still having a bit of a hard time exactly visualizing how the retaining walls will look and all that.
It's going to be deep, that's for sure - current track level, minus 2 metres of deck, then ~4.5 m of clearance under the bridge! Essentially, two stories lower than what it was before.
It's going to be deep, that's for sure - current track level, minus 2 metres of deck, then ~4.5 m of clearance under the bridge! Essentially, two stories lower than what it was before.