06-14-2016, 05:34 PM
(06-14-2016, 04:59 PM)GtwoK Wrote: I was wondering, when examining the grade from the bridge: The incline to get on the bridge needs to start PAST Duke, what does that mean for the layover in-between King and Park? it will need an incline too, to match, but it didn't really seem feasible. Won't the Shirley layover need to be complete before grade work can be done for the bridge?
The distance from the overpass to Park (570m) is longer than the distance to Duke (350m). Even Weber is under 500m.