10-25-2016, 11:10 AM
(This post was last modified: 10-25-2016, 11:23 AM by Pheidippides.)
Very busy around uptown today:
-a huge pour is ongoing at Waterloo public square station with trucks lined up and unloading in to a huge concrete pumper
-sidewalks along shopify portion of caroline are being poured
-a large metal box was unloaded by crane on to this willis platform looks electrical in nature; ruins the look of the stop-hopefully it gets covered up; it looks #12, the system equipment cabinet, in the diagram http://rapidtransit.regionofwaterloo.ca/...pdf#page=4
-framing of the concrete forms along king, William to willis is progressing quickly
-a huge pour is ongoing at Waterloo public square station with trucks lined up and unloading in to a huge concrete pumper
-sidewalks along shopify portion of caroline are being poured
-a large metal box was unloaded by crane on to this willis platform looks electrical in nature; ruins the look of the stop-hopefully it gets covered up; it looks #12, the system equipment cabinet, in the diagram http://rapidtransit.regionofwaterloo.ca/...pdf#page=4
-framing of the concrete forms along king, William to willis is progressing quickly
Everyone move to the back of the bus and we all get home faster.