12-04-2016, 01:16 PM
4/6 - Sunday, December 4, 2016
A whole whackload of new signage.
Embedded curve from King onto the Waterloo Spur.
Future Waterloo Town Centre station area.
As others noted - the old cobblestone path through these two buildings has now been paved wall-to-wall. Surprised, but very happy to see, as I'm a frequent user of the Spur Line and Laurel trail.
A whole whackload of new signage.
Embedded curve from King onto the Waterloo Spur.
Future Waterloo Town Centre station area.
As others noted - the old cobblestone path through these two buildings has now been paved wall-to-wall. Surprised, but very happy to see, as I'm a frequent user of the Spur Line and Laurel trail.