01-27-2017, 05:57 PM
The lot was temporarily given to GrandLinq to be used as staging for the grade separation construction. Until LRT is done GrandLinq has control of the lot, and there's not a lot that could be happening.
King-Victoria Transit Hub
|
« Next Oldest | Next Newest »
|