05-01-2017, 09:17 AM
I would think that we could easily look at the grade separation and see if they put in platform along the entire length, which would be required in order to have west-side southbound stop access to the bridge. But don't forget, they refused to put the TPSS between the School of Pharmacy and the rails because they didn't want to have to do any soil remediation (when costs might have been split between the Region and GrandLinq). So there's a chance that if we move forward with a west-side access to the platform, it will only happen if they decide to do the remediation of the soil needed to create a stairway/elevator there, and shoulder 100% of the costs.